Fixed-price contracts, weekly photo reports from site, and a five-year
warranty we have never had to argue about. Building on an island, without the horror stories.
From a leaking roof to a whole villa. Small jobs get the same contract, the same
schedule and the same warranty as the big ones — just a shorter timeline.
The build, week by week
A villa is twelve working weeks of dry season, one fixed price, and a Friday
report in your inbox — wherever in the world your Friday starts.
Wk 1–2
Site & foundations
Set out, dug and poured. The week the neighbours form their opinions — bring them a drawing.
Wk 3–6
Block & roof
Walls up, roof on, weather out. From here, rain season stops being a risk and becomes a schedule line.
Wk 7–10
Fit-out
Electrical, plumbing, air-con and tiles. The Friday photos start getting interesting.
Wk 11–12
Pool & garden
The pool turns over clear, the lawn goes down, and the villa starts showing off.
Handover
Keys & five years
We close the snag list together, hand over the keys and the warranties — then stay on call for five years.
Rain season is not an excuse.
It is a schedule line. Our contracts carry weather buffers, covered storage and a
crew that has built through every October this island has thrown at us.
The Friday photo report
PALMLINESite report · Friday 17:00 · Week 7 of 12
This week
Roof tiles on the west wing, pool shell poured, gravel drive graded.
Next week
Fascia and guttering, bathroom tiles, first coat on the garden wall.
Every Palmline client gets this every Friday — photos, costs against the schedule, and what we need from you. Wherever you are.
Materials yard, workshop and office in one place — walk in and touch the actual
timber and tile your house would use. Saturdays there is coffee on the sawhorse.
Hours
Mon–Sat · 07:30–18:00
Site visits
Free within 20 km
Languages
TH · EN · DE